Measure and mark a square 1.2 x 1.2m. The diagonal measurement...
|
Tie string around the base of the bamboo canes to mark out the...
|
Compact the soil in the base of the pit.
|
Dig a pit 40cm deep, inside the string line. Place the excavat...
|
Make sure that the sides of the pit are smooth and vertical.
|
 |
 |
 |
 |
 |
|
Lay the paving slabs a the bottom of the pit, and with a spiri...
|
Join the 4 panels together to form a box by securing the first...
|
Measure out a section of heavy duty industrial plywood for one...
|
In each corner, about 4cm in from the edge, mark the position ...
|
Measure and mark out the remaining 3 strips of wood to the sam...
|
 |
 |
 |
 |
 |
|
Saw carefully along the saw lines to make 3 more side panels. ...
|
For each panel, place one bracket on it mark in the top right ...
|
Fasten each bracket with 2 screws to form a corner joint in ea...
|
Insert the box into the pit so that it sits just on the edge o...
|
The finished sandpit with a bucket, toy rake and spade in the ...
|
 |
 |
 |
 |
 |
|
Smooth off any splinters or sharp edges on the box with sandpa...
|
Treat the outer surfaces of the sandpit with a wood preservative.
|
Fill the sandpit with washed or play sand to within 15cm of th...
|
The sandpit with soil banked up around the sides.
|
Part of the sandpit lid with the rope handle at the corner.
|