 |
 |
 |
 |
 |
|
Tie a knot in the top end of the rope swing to prevent it pull...
|
Evenly measure and mark out positions for the rungs on the lad...
|
Fit the rungs into position using a spanner and 2 coach screws...
|
Position the ladder beneath the back floor support pole at the...
|
Fasten the ladder securely to the underside of the back floor ...
|
 |
 |
 |
 |
 |
|
Climb onto the tower using the ladder. Thread the rope swing t...
|
Measure and mark out the play area using a tape measure, strin...
|
Lay out the timber sleepers along the boundary of the marked-o...
|
Fasten the joints together using 15cm nails hammered through t...
|
Measure and mark the last sleepers that have to be cut to size...
|
 |
 |
 |
 |
 |
|
Position a second layer of sleepers on top of the first so all...
|
Cut each sleeper along the marked line carefully with a hand s...
|
Mark the ground to show the desired position of the base of th...
|
Twist a ground anchor into the bottom of each hole using a spa...
|
Fill in each hole around its ground anchor with the loose soil...
|
 |
 |
 |
 |
 |
|
Once buried, the hooked ends of the anchors should be protrudi...
|
Secure ground anchors are now in position inside the walled pl...
|
Spread out the geotextile membrane so that it covers the entir...
|
Cut a small slit above each of the ground anchors to allow the...
|
Push the membrane down so that it lies flat against the soil a...
|