Line up the front upright support poles on the ground. Here, 2...
|
Align the pre-drilled holes, and drive the front rung through ...
|
Lift the front section on its side and ask a helper to support...
|
Lower the front section back to the ground, and align a floor ...
|
Hammer 2 bolts through pre-drilled holes.
|
 |
 |
 |
 |
 |
|
Turn the frame over and fit the front base support pole to the...
|
Turn over the frame. Position a diagonal support at the front,...
|
Secure the poles with 2 coach screws and tighten with a spanner.
|
Lay the front of and back sections on their sides, and ask a h...
|
Position a side base support pole. This should be in alignment...
|
 |
 |
 |
 |
 |
|
Fit the base support pole using 2 coach screws. Make sure all ...
|
Fix side rails to the upper half of the side section. Turn ove...
|
Fit the roof beam to one of the prefabricated roof sections us...
|
Nail the floorboards onto the back and front floor support pol...
|
Tip both roof sections onto their ends and join the second sec...
|
 |
 |
 |
 |
 |
|
The finished roof should be strong enough to stand freely. It ...
|
Move the roof into place at the top of the tower. Fasten it to...
|
Double check all the joints to make sure that all coach screws...
|
Lift the tower into its standing position. The structure will ...
|
Lay out the ladder sections to make sure you have all the part...
|